Cycle Vancouver

IBR 3D Renderings

Review the rendering options side by side

Author: ilopez

Published: 2024-10-26

Interstate Bridge Replacement - 3D Rendering Previews

Early in October of 2024, the IBR team released a series of youtube videos that detailed the various design options considered for the project area. Unfortunately when viewing the videos individually on youtube it was difficult to comprehend the project differences, with the caveat that the designs are not fully representative of the technical designs.

We felt it was still valuable to compare the options presented. With the help of the CycleVancouver techie group, we are able to provide “side-by-side” viewing of the published IBR videos.

The birds eye view is the project area in general without specific design options.

Northbound Videos have three different designs to compare against.

Southbound Videos have two designs rendered.

We offer this page as is, please write in your IBR comments, please use justcrossing.org’s IBR Comment form so comments can be tracked. https://justcrossing.org/ibr-comment/

-Israel

Bird’s Eye View

Bird’s Eye View of I-5 Interchanges in Program Area

Northbound

Southbound

Double-deck, Fixed-span Truss Bridges, 2 Aux Lanes and C St Ramps

Single-level, Fixed-span Steel Girder Bridges, 1 Aux Lane and No C St Ramps